Catch scope gaps and revision changes before they come out of your margin.
CIM Build reads your drawings, specifications and consultant reports on every revision, and cites each gap and change to the sheet and clause it came from.
Also for developers, developer-builders and consultants.
Used by Australian builders
Where scope risk starts
Every builder has the same problem
Your delivery team inherits the job in a one-hour meeting. After that, what the tender was priced on gets hard to find.
- Exclusions you priced out get built anyway, because the site team never saw them.
- Nobody checks new revisions against the tender, so extra scope gets built at your cost.
- Unclouded changes reach site unnoticed, and the variation is never raised.
- Answering one question about the tender takes hours of digging through SharePoint and email.
Where margin goes
Where builders lose margin
Report requirements that never reach the drawings
The problem
A requirement in the fire engineering, acoustic or access report is missing from the drawings. It turns up after the trade is engaged, and the fix comes out of your margin.
With CIM
Check every requirement in your consultant reports against the drawings, with each mismatch cited to the clause and the sheet.
How it worksRevisions that change what you priced
Scope that falls between trade packages
How CIM helps
Shared context across your team
CIM reads your drawings, specifications and consultant reports where they already live, on every revision. Estimators, design managers, project managers, construction managers and contract administrators each see the gaps and changes that affect their part of the job, from tender to handover.
The product
See it on a job
Project assuranceAssistantDocumentsRFIDesign riskReport complianceRevision trackingScope of worksQuotesScope comparisonsProject assurance
all 4 gatesTender submission
Not ready 612 of 612 documents in CIMEvaluated 2 hours ago ยท Rev D
Tender due
12 Dec
16 days left
Close stage- Document health All passed 612 of 612 passed
- Consultant report compliance 3 to resolve 3 audits run
- Documentation discrepancies 5 discrepancies 4 schedules checked
- Trade scope No discrepancies 18/18 trades extracted
Consultant report compliance
Findings| Audit | Result | Last run |
|---|---|---|
| Acoustic report against the drawings | 1 finding | 2 hours ago |
| Access report against the drawings | 1 finding | 2 hours ago |
| Fire engineering report against the drawings | 1 finding | 2 hours ago |
Project assurance. Shows whether the job is ready for its next stage, gate by gate, checked against the current set.
Take a tourCustomer stories
Why builders run their jobs through CIM
$50K+ exposure caught before the window package was let
How a commercial builder turned a six-hour manual cross-check into a ten-minute review on a $15M lump-sum job.
Read the story Read customer storiesOur purpose
Every building constructed to code and standard.
We start with the documents: the drawings, specifications and consultant reports every job is priced and built from. The site is next.
Read our purpose
Insights
The latest from CIM Build
Articles and guides for builders on tenders, drawings and design risk.
- Who is responsible if an AI compliance check gets it wrong? 29 November 2026 Article
- Can AI count fixtures, joinery, doors and FF&E off the drawings? 28 November 2026 Article
- Does drawing quality or format affect AI drawing review accuracy? 28 November 2026 Article
- Does AI drawing review give the same answer every time it runs? 28 November 2026 Article
- Can AI check drawings against DA conditions? 28 November 2026 Article
Questions
Frequently asked questions
Where is CIM Build's data stored?
CIM Build's standard hosted environment keeps customer data in Australia. The sub-processor list, architecture overview and data processing terms are published at trust.cim.build.
Does CIM Build train AI models on customer documents?
No. Your documents, prompts and configured checks remain yours, they are not used to train models made available to other customers, and you can request deletion at any time and receive written confirmation.
Is CIM Build SOC 2 compliant?
CIM Build attained SOC 2 Type I in July 2026. An independent web application penetration test in June 2026 returned zero critical findings, and all findings have been remediated.
How do I know a finding is right?
Every finding cites the sheet, the clause and the document it came from, so the person reviewing it can open the source and confirm it in seconds. The team triages each finding as reviewed, needs action or RFI, and nothing goes to a consultant until a person sends it.
AI-suggested RFIsCan ChatGPT or Claude review a full construction document set?
ChatGPT and Claude can read the files you upload to one conversation, and they are useful for drafting and for questions about a single document. CIM Build reads the whole set together, checks each document against the others, cites the sheet and clause for every finding, and runs again on every revision, which is the work a tender review needs.
ChatGPT vs Claude vs Copilot for constructionWill my team rely on the AI instead of learning the job?
CIM Build does the reading and the cross-referencing, and the estimator or design manager makes every call on what a finding means for the price or the schedule. Because each finding links to its source, juniors see exactly where the problem sits in the documents.
How do I try CIM Build on my own project?
Book a briefing and bring a current tender pack or a set from a job you know well. The team runs it through CIM Build and walks you through what comes back, cited to your own sheets.
Book a briefingContact
Start managing scope risk like every other risk on the job
Book a briefing with our team.
Book a briefing